Testimonials
I have used Henderson Engineering as a sub-contractor for fabrication works
for something approaching 20 years now. As an industrial chimney maintenance
specialist
there are three key areas in which a supplier must meet our expectations every
time.
1. Safety is paramount given the great heights at which we constantly work
to service and maintain industrial chimneys.
2. Quality must be completely assured as once a chimney is returned to service
it often cannot be shut-down again for many year for repairs or re-work.
3. Delivery dates have to be met without fail as an industrial chimney is often
the last item of equipment to be made available for repairs and the first item
required back during plant maintenance shutdowns.
Henderson’s have never let me down on any of these key items and,
as such, will continue to be our preferred supplier for fabrication and onsite
installation.
David Hughes (Operations Director)
Proteq (Northern) Limited
The Pinnacle Works
Station Road
Epworth
Doncaster
DN9 1JU
T: 01427 872572
F: 01427 875094
M: 07976 504766
W: www.proteq.co.uk
The service received from Henderson Engineering over the
past decade has been second to none. Their ability to perform complicated
engineering tasks to exacting standards within tight project schedules has
assisted us on many occasions. The flexibility offered despite a constantly
fluid project schedule is fantastic.
J.Fenton (Senior Methods Engineer)
York Linings International Limited
have dealt with Henderson Engineering (N.E.) Ltd. on a regular basis over the
past decade and would have no hesitation to recommend them for the supply of
quality fabrication.
We have always found the staff to be very courteous and
efficient in dealing with our orders, which are mostly on an urgent basis.
They are always willing to tackle the impossible to produce the goods on
time.
Brian Ellis
Purchasing Manager
York Linings International Ltd.
www.yorklinings.com
Henderson Engineering have been engaged to carry out works
at Hartlepool Power Station and have been found to carry out their tasks to
specification, detail and have a questioning attitude.
With the ability to
be flexible when required to work around unforeseen problems. In addition they
have proved able to work to the stations stringent safety policies and expectations.
We would be pleased to work with them in the future.
Dave White
Balfour Beatty Work Place
Seconded to British Energy-EDF Corporate Security as Resident Engineer
Hartlepool Power Station.
|